Under-cabinet LED lighting installed in a cottage kitchen in South Hampshire

Electrical testingand inspection acrossLocks Heath & Southampton

Whether it's a single circuit, a new installation, or a full periodic check, testing tells you what's actually happening inside the wiring, carried out with calibrated equipment and reported clearly.

Rated 5.0 on Google · 12+ years in the trade · NAPIT registered

City & Guilds 2391-52

Qualified specifically in inspection and testing

NAPIT registered

Testing and certification to current wiring regulations

£5m / £10m cover

Public and employer's liability insurance in place

5.0 on Google

Rated by clients across South Hampshire

12+ years in the trade

Founded 2021 by Director Andrew Hardiman

Overview

What testing and inspection covers

Testing and inspection is the process of checking an electrical installation, or a specific part of it, against current wiring regulations using both a visual check and instrument testing. It sits behind almost every other piece of electrical work: new circuits get tested before being signed off, existing installations get periodically inspected, and specific circuits get tested when something needs confirming.

It's needed after any new installation or alteration, as part of a periodic check on an existing property, when a fault is suspected but not yet confirmed, or when a landlord, business, or homeowner needs documented evidence that an installation meets current standards. It differs from an EICR in scope: testing and inspection can be a targeted check on part of an installation, whereas an EICR is a full condition report, but both rely on the same underlying test procedures.

The value of testing lies in what it reveals that a visual check alone can't: insulation resistance, loop impedance, RCD trip times, and continuity of protective conductors are all things you can't see by looking, but they determine whether the installation will actually protect people and property under fault conditions.

  • Who it's for

    Homeowners, landlords, and businesses needing confirmation that a circuit or installation meets current standards.

  • When it's needed

    After new work, at periodic intervals, when investigating a suspected issue, or for compliance evidence.

  • What you get

    Test results and, where appropriate, a certificate, EIC, EICR, or minor works, matching the scope of work.

  • Why it matters

    Instrument testing catches faults that are invisible to a visual inspection alone.

What happens if it is left

What testing catches that a look-over won't

A visual inspection tells you a lot, but several of the most important safety measures in an installation can only be confirmed by testing with calibrated instruments.

RCDs that don't trip correctly

An RCD can look correctly fitted yet fail to trip within the required time, leaving a shock risk undetected until tested.

High earth fault loop impedance

If this value is too high, a fault won't clear quickly enough to protect against shock or fire.

Insulation breakdown

Degraded cable insulation can allow current to leak between conductors or to earth without any visible sign.

Incorrect polarity

Reversed polarity on a circuit can leave supposedly isolated parts of the circuit live even when a switch is off.

Common mistakes we are called out to fix

  • Relying on a visual check alone when a fault or compliance question needs an instrument test.
  • Testing a circuit in isolation without considering how it interacts with the rest of the installation.
  • Using uncalibrated or unsuitable test equipment.
  • Skipping documentation of results, leaving no record for future reference.

Our process

How we approach testing and inspection

The scope varies by job, but the underlying method is consistent and thorough.

  1. 01

    Confirm the scope

    We agree whether it's a single circuit, a new installation, or a wider periodic check, and what certificate or record is needed.

  2. 02

    Visual inspection

    We check accessible wiring, connections, and protective devices for condition and compliance.

  3. 03

    Dead testing

    With the supply isolated, we test continuity, insulation resistance, and polarity.

  4. 04

    Live testing

    With the supply restored, we test earth fault loop impedance and RCD operation under load.

  5. 05

    Document and certify

    Results are recorded and the appropriate certificate, EIC, EICR, or minor works, issued, with building control notified directly where the work is notifiable.

What you get

What proper testing gives you

Speed

We can often test a single circuit or small installation in one visit.

Safety

Instrument testing confirms protective measures are actually working, not just present.

Longevity

Catching insulation or connection issues early prevents them developing into bigger faults.

Cost clarity

Testing is priced individually once the scope is agreed, with a written quote provided upfront.

Reliability

Calibrated equipment and a consistent method give results you can rely on.

Peace of mind

Documented results and the right certificate give you evidence the installation meets current standards.

In detail

The detail behind testing and inspection

Dead testing versus live testing

Dead testing is carried out with the circuit isolated from the supply and covers continuity of protective conductors, insulation resistance between live conductors and earth, and polarity, confirming conductors are connected the right way round. These tests have to be done with the supply off, because they'd give false or dangerous results otherwise.

Live testing follows once the supply is safely restored, and covers earth fault loop impedance at relevant points and RCD operation, including trip times under test current. Together, dead and live testing build a complete picture of whether the circuit will behave safely under both normal and fault conditions.

Equipment and calibration

Accurate results depend on properly calibrated test instruments; equipment drifts out of calibration over time and use, so it needs regular checking against a known standard. We use instruments appropriate to each test being carried out, since insulation resistance testing, loop impedance testing, and RCD testing all use different measurement principles and equipment settings.

New installations versus periodic checks

Testing on a new installation or alteration confirms the work has been done correctly before it's signed off with an EIC or minor works certificate, and it's carried out as a matter of course on every job we complete, not as an optional extra. Periodic testing, by contrast, checks how an existing installation has held up over time and is usually carried out as part of a wider EICR rather than in isolation, though targeted circuit testing on request is available where a specific concern has been raised.

Residential and commercial scope

Domestic testing typically covers a single consumer unit and its circuits, whereas commercial premises may have multiple distribution boards and a wider range of circuit types, meaning the time and approach needed are assessed on site. In both settings, results are documented and the correct certificate issued to match the work carried out.

Recent work

Photographs from jobs we have completed

Scroll across to see more of our completed work.

  • Media wall lighting and power installation with recessed LED alcove lighting
  • Bathroom LED lighting installed to the correct IP rating by a NAPIT registered electrician
  • LED strip stair lighting installed on a new staircase during a build
  • Colour-changing LED cove and under-cabinet lighting in a kitchen extension
  • LED downlights installed in a living room ceiling with an even lighting layout
  • Kitchen island pendant and LED downlight installation in a period property
  • Lighting installed in a timber-lined garden room ceiling in South Hampshire

Common questions

Answers before you get in touch

How much does testing and inspection cost?

It's priced individually depending on the scope: a single circuit test is a different job to a full periodic inspection, and we confirm everything with a written quote first.

How long does testing take?

A single circuit can often be tested in a short visit, while a wider periodic check takes longer; we'll give you a realistic estimate once we know the scope.

What does the testing process actually involve?

We carry out a visual inspection, then dead testing with the circuit isolated, followed by live testing with the supply restored, before documenting the results.

What certificate will I get?

Depending on the job, you'll receive an EIC for new work, an EICR for a full condition check, or a minor works certificate for smaller alterations.

How often should testing be carried out?

New work is tested as part of the job itself; existing installations are typically checked periodically, commonly every few years, depending on property type and use.

What are your working hours?

We work Monday to Friday, 8am to 5pm, call 07730 498814 or send us the details online.

Do you carry out testing across the wider Southampton area?

Yes, as well as Locks Heath, we cover Warsash, Hedge End, Southampton, Fareham, Titchfield, Park Gate and Whiteley.

Can you test a single circuit without inspecting the whole installation?

Yes, targeted testing on a specific circuit is possible where that's all that's needed, we'll agree the scope with you before booking anything in.

Next step

Book testing and inspection

Tell us what needs testing and we'll come back with a written quote, call 07730 498814 or get in touch online.

07730 498814

hardielectrical@outlook.com

Monday to Friday, 8am–5pm

NAPIT registered · £5m public liability · £10m employer’s liability

Call nowGet an estimate